Brock Brothers ContrustionCompany will perform building demolition, interior and or exterior, (up to three stories high), minor carpentry installation and trench dig-out and back filling,
Thus far, contracts that were awarded and executed include:
- 17 residential houses ranging between two and three story in height
- 28 stucco walls
- 2 residential car garages
- 3 commercial building water french drain system
- 3 repair of retaining wall
- 23 Lots; site grading and add topsoil seed and straw on abandoned lots
- 6 different locations; demo and replace sidewalks
- 4 different locations; trench dig-out and backfill
- 2 site prep and grading for jungle Jim at a recreation parks
- 1 commerical site excavation with 3 gas tanks removed
- 3 interior demo train wash warehouse
- 3 site grading at residential homes
- 3 exterior select site items demo in preperation for site contractor